An article from: Pete's Blog

 

Trials and tribulations – part 4

Ongoing work at the renovation of the formal pond hit a stumbling block. Having pre ordered a made to measure welded liner (box welded liner) it arrived made to the wrong measurements. We double checked the measurements our end, which were correct, and so the company managed to turn around a new one to the right measurements within 24 hours – so thank you to them. After having a day off that they hadn’t planned on, the team pulled out all the stops to get the liner in and the job back on track.

This entry was posted in Pete's Blog. Bookmark the permalink.